Kurt Dittrich
Test facility, Integration facility, Clean rooms
Phone:+49 89 30000-3542Fax:+49 89 30000-3569

Bilder

Clean room established: eROSITA integration level Zoom Image
Clean room established: eROSITA integration level
Clean room established: eROSITA integration level Zoom Image
Clean room established: eROSITA integration level
New clean room: in the foreground the telescope lid of eROSITA in the material lock, in the background the thermal vacuum chamber V and work table Zoom Image
New clean room: in the foreground the telescope lid of eROSITA in the material lock, in the background the thermal vacuum chamber V and work table [less]
New clean room: in the foreground the telescope lid of eROSITA in the material lock, in the background the thermal vacuum chamber V Zoom Image
New clean room: in the foreground the telescope lid of eROSITA in the material lock, in the background the thermal vacuum chamber V [less]

Clean Rooms

In two clean rooms ISO class 6, projects can be realized under clean room conditions.

For both clean rooms

Cooling water supply (possible from integration Hall)

LN2  supply ( possible from integration Hall)

Clean room  established

Space for projects:

approximately 33 m ²

Room height:

5.4 m

Clean room class:

ISO 6 (1000 US Fed. Std.)

Gantry crane:

2 t

Compressed air supply

Clean room new

Space for projects:

approximately 19 m ²

Room height:

4.3 m

Clean room class:

ISO 6 (1000 US Fed. Std.)

Pillar jib crane

up to 0.7 t

Compressed air supply


letzte Änderung 2014-12-04 durch R. Mayr-Ihbe

 